|
Manufacturing Plants |
|
|
|
1 |
Hanggar Narrow Body and Facilities Support |
2012-2015 |
PT Garuda Maintenance Facility Aero Asia |
Hanggar for Airplane Maintenance have total area 40.000 m2 |
2 |
Kertapati Port Upgrading, South Sumatera |
2001-2002 |
PT Tambang Batubara Bukit Asam (PERSERO) |
Kertapati Port Upgrading (package J-175 C) |
3 |
Glucose and Fructose, Cikarang, Bekasi |
1997-1998 |
Associates British Budi |
1 Block sugar factory building consist of 2 stories with total floor +/- 6.480 m2 |
4 |
Baruna Jaya in Dadap Beach, Tangerang |
1994 - 1995 |
BPPT |
Consist of port, facilities, offices, housing, road and other infrastructure |
5 |
Depot Satelit Surabaya, East Java |
1994 - 1995 |
PT Superindo Bakti Persada |
Basic design for fuel terminal capacity 101.000 lt with total area 180.000 m2 and length of piping is 40 Km |
6 |
Instans Coffe Factory at Panjang Lampung |
1994 - 1994 |
PT Indofood Raya |
Quantity surveying for instant coffe factory at panjang lampung |
7 |
Asphalt Terminal in Cirebon |
1993 - 1995 |
PT Jaya Trade |
Design & engineering, quantity surveying & site supervision of asphalt terminals |
8 |
Chopstick Factory, Pemalang, Central Java |
1989 - 1989 |
PT Jaya Trade |
Chopstick Factory at 1.1 Ha land area |
9 |
Marunda Timber Center Industry, Jakarta |
1988 - 1990 |
PT Pusat Perkayuan Marunda (persero) |
Timber processing and distribution center works including of jetty ( 1 st phase & 2 nd phase) and infrastructure, hospital and other facilities land area : 410 Ha |
10 |
Research and Development of Nuclear Technology, Serpong |
1988 - 1989 |
Badan Tenaga Atom Nasional |
In pile loop production system, consist of electrical system instrumentation radiation preventive, handling system, waste treatmen decontamination building, 3 stories, 4.000 m2 |
11 |
Nagasakti Shoes Factory, Tangerang |
1988 - 1989 |
PT Citra Cakra Murdaya |
Shoes Factory, with building total area 45.000 m2 |
12 |
Gudang Garam Cigarette Paper Factory in Kediri |
1987 - 1988 |
PT Surya Zig Zag |
3 floor, factory area : 7.800 m2 land area 6 Ha |
13 |
Army Facility Industry, Bandung, Tasikmalaya, and Malang |
1982 - 1997 |
PINDAD |
Weapons production facility with total 80 Ha land area including all social facilities |
14 |
Alumina Process Plant, Bintan, Sumatera |
1982 - 1983 |
PT Aneka Tambang |
Designed production capacity designed 600.000 MTPY, Project was canceled |
15 |
PAL Shipyard Industry, Surabaya |
1980 - 2000 |
PT PAL (persero) |
Land area 60 Ha, main works consist of :
- Patrol boat production
- Tanker production
- Passenger & freightships production
- Ship maintenance facility
- Technology development & Computer center building
- Management office & social facility building
- Ship lift, capacity 1.500 TLC pier, tower, retaining wall
- Power house, capacity 20 MVA with reserve 8 MVA diesel power plant |
16 |
Hydrocracking Oil Refinery, in Dumai (joint operation between pembangunan jaya with TRC, Spain) |
1980 - 1984 |
Pertamina |
Plant process works, capacity 100.000 barrels per stream day, land 148 Ha, main works consist of process area and off site area the main figure of works as follows :
- Concrete works : 108.411 m2
- Steel works : 10.674 ton
- Piping works : 12.897 ton
- Equipment installation : 33.682 ton
- Steel Stank works : 10.541 ton
- Pile : 18.700 points
- Loop Instrument : 3.023
- Power plant : 4 x 14 MVA
- Pipe drilling (02) : 202.500 LM
- Stream tracing : 163.500 LM
- Electricity cable works : 1.633 km
- Tank Farm
- Harbour |
17 |
Nusantara Aircraft Industry, Bandung |
1976 - 2001 |
PT IPTN (Persero) |
Land area 64 Ha, main works consist of :
- power house capacity 90 MVA, and backup diesel capacity 30 MVA and 12 MVA
- Fixed wing & rotary wing building
- Dittek hangar, 12 floors area : 4.750 m2
- Water tower capacity 900 m3 diesel PP
- General workshop and engine werehouse
- Universal maintenance center
- Connection bridge from 3 rd power house to composite bonding center hangar
- Connection bridge 3 rd production area to 4 th production area
- Gear box test stand building
- Composite bonding center hangar long tunnel concrete structure 400 m area : 3 m x 2.5 m x 7 m underground structure
- Water facility, LE : Water treatment deep well |