|
Power Plants |
|
|
|
1 |
Gorontalo Coal Fired Steam Power Plant, Gorontalo |
2014 - 2016 |
PT PLN (Persero) Jasa Management Konstruksi |
Engineering Review (Review Design and Drawing Approval) Quality Assurance & Quality Control For Gorontalo Coal Fired Steam Power Plant with capacity 2 x 25 MW |
2 |
Bangkanai Gas Power Plant, Central Kalimantan |
2013 - 2015 |
PT Rekadaya Elektrika Consult |
Engineering Supervision and Contruction Supervision and Quality Assurance/Quality Control for Bangkanai Gas Fired Power Plant with capacity 155 MW |
3 |
Kendari Unit 3 and Bau-Bau Coal Fired Steam Power Plant Kendari and Bau-Bau, Southeast Sulawesi |
2012-2015 |
PT. PLN (Persero) UIP XII |
Engineering Supervision (Review Design and Drawing Approval) for Kendari Unit 3 (1 x 10 MW) and Bau-Bau (2 x 10 MW) Coal Fired Steam Power Plant. |
4 |
Asahan 3 Hydroelectric Power Plant Construction Project |
2010-2015 |
PT. PLN (Persero) |
Engineering Services for Asahan 3 Hydroelectric Power Plant Construction Project with capacity 2 x 87 MW. |
5 |
Malinau Coal Fired Steam Power Plant, East Kalimantan |
2010-2012 |
PT. PLN (Persero) |
Construction Supervision and Quality Assurance / Quality Control for Malinau Coal Fired Steam Power Plant with capacity 2 x 3 MW. |
6 |
Lapai 1 Minihydro Power Plant, Sulawesi |
2010-2011 |
PT. PLN (Persero) |
Feasibillity Study and Detailed Design Lapai 1 Minihydro Power Plant, with capacity (2 x 2000 MW). |
7 |
Cilegon Combined Cycle Power Plant, Banten |
2010-2010 |
PT. Ferrostaal Indonesia |
Technical Assistant for Combined Cycle Power Plant with Capacity 120 MW. |
8 |
Peusangan 1 & 2 Hydroelectric Power Plant Construction Project |
2009-2015 |
PT. PLN (Persero) |
Engineering Services for Peusangan 1 & 2 Hydroelectric Power Plant Construction Project with capacity 86.4 MW (44.2 MW and 42.2 MW). |
9 |
Tanjung Jati B Coal Fired Steam Power Plant Expansion Project Jepara, Central Java |
2009-2013 |
PT. PLN (Persero) |
Construction Supervision for Coal Fired Steam Power Plant with capacity 2 x 660 MW. |
10 |
Tanjung Enim Mine Mouth Coal Fired Steam Power Plant (Package 08-107) |
2009-2012 |
Black & Veatch International Company |
Owners Engineering Services for 3 x 10 MW Tanjung Enim Minemouth Coal Fired Steam Power Plant. |
11 |
Lampung Coal Fired Steam Power Plant, Lampung |
2009-2011 |
PT. PLN (Persero) |
Contruction Supervision and Quality Assurance / Quality Control for Lampung Coal Fired Steam Power Plant with capacity 2 x 100 MW. |
12 |
Sumatera Utara (Sumut) Coal Fired Steam Power Plant, Medan North Sumatera |
2009-2011 |
PT. PLN (Persero) |
Construction Supervision for Coal Fired Steam Power Plant with capacity 2 x 200 MW. |
13 |
New Sumbagut Coal Fired Steam Power Plan, North Sumatera |
2009 - 2010 |
PT PLN (Persero) |
Feasibility Study for Coal Fired Steam Plant with capacity 2 x 200 MW |
14 |
Technical Services for Banjarsari Minemounth 2 x 100 MW Coal Fired Steam Power Plant and on land Transmission Line of 150 kV (24 km) and extension Lahat Substation Project. |
2008 - 2011 |
PT Bukit Pembangkit Innovative |
Basic design review, detail design review through some intensive meeting, construction management and commissioning for 2 x 100 MW Banjarmasin Minemouth Coal Fired Steam Power Plant (MMCFSPP) and approximately 24 km Overhead Transmission Line facility of 150 kV for connection between Banjarmasin MMCFSPP to PLNs Sumatera grid system |
15 |
South Kalimantan Coal Fired Steam Power Plant, Asam-asam, Banjarmasin, South Kalimantan |
2008 - 2010 |
PT PLN (Persero) Jasa Enjiniring |
Review Design for South Kalimantan Coal Fired Steam Power Plant with capacity 2 x 65 MW |
16 |
Labuhan Angin Coal Fired Steam Power Plant, North Sumatera |
2008 - 2008 |
PT PLN (Persero) |
Technical Assistant for Coal Fired Steam Power Plant with capacity 2 x 115 MW |
17 |
Quality Assurance and Quality Control for Four Coal Fired Steam Power Plant Projects (PLTU 1 Banten, PLTU 2 Jawa Timur, PLTU 1 Jawa Tengah & PLTU 2 Jawa Tengah Package 1) |
2007 - 2011 |
PT PLN (Persero) |
PLN intend to build four Coal Fired Steam Power Plants, which consist of :
PLTU 1 Banten 1 x (600-700 MW) located in Suralaya, West Java
PLTU 2 Jawa Timur 1 x (600-700 MW) located in Paiton, East Java
PLTU 1 Jawa Tengah 2 x (300-400 MW) located in Rembang, Central Java
PLTU 2 Jawa Tengah 1 x (600-700 MW) located in Adipala, Cilacap, Central Java
In general, the Consultant shall carry out supervision, coordination, inspection and be responsible during manufacturing / fabrication works of Plants equipment and materials to be supplied by EPC Contractor |
18 |
Engineering Services of Feasibility Study/Bathymetry Survey, Type and Location of Coal Unloading Jetty/Site Investigation, Topography Geology and Soil Mechanical/Study of Thermal Dispersion Coal Fired Steam Power Plant (2 x 50 MW) Parit Baru |
2007 - 2008 |
PT PLN (Persero) Proyek Induk Pembangkit dan Jaringa Kalimantan |
PLN intend to build Coal Fired Steam Power Plants location in Parit Baru, Jungkat village, Siantan, Pontianak, West Kalimantan, with capacity : 2 x 50 MW. The main purpose of consultant activities as follows: site investigation, study and feasibility study |
19 |
PLTU Rokan Hulu 2 x 100 MW (canceled) |
2006 - 2007 |
PT Haka Power Indonesia |
Feasibility Study for Rokan Hulu Steam Power Plant with capacity 2 x 100 MW (canceled) |
20 |
Tanjung Priok Gas Fired Power Plant Extension Project, North Jakarta |
2005 - 2009 |
PT PLN (Persero) |
Engineering services for installation of one block of 720 MW combined cycle gas fired power plant (configuration 2:2:1) together with all the associated auxiliary equipment station support facilities and related transmission facilities including the demolition existing two units of 25 MW conventional oil fired power plant, existing gas turbines and auxiliaries and warehouse, etc |
21 |
Muara Karang Gas Fired Power Plant, North Jakarta |
2004-2009 |
PT (PLN) Persero |
Engineering services for the gas fired 720 MW combined cycle power plant to replace the existing 3 units of 100 MW conventional oil fired power plant |
22 |
Muara Tawar Gas Fired Power Plant Extension Project, North Jakarta |
2004 - 2008 |
PT PLN (Persero) |
Engineering services for the power station comprises the install of one 1,100oC class, multi shaft gas turbine, one HRSGs and one steam turbine with total capacity 225 MW. |
23 |
Tanjung Jati B Coal Fired Power Plant, Jepara, Central Java |
2004 - 2008 |
PT PLN (Persero) |
Construction Supervision for Coal Fired Power Plant with capacity 2 x 660 MW |
24 |
Merak Energy Coal Fired Power Plant, Serang, Banten |
2003 - 2003 |
PT Prima Solusindo Sejahtera QQ PT Merak Energi Indonesia |
Bidding Evaluation Process of Contractors for Coal Fired Steam Power Plant with capacity 2 x 60-65 MW |
25 |
Tarahan Coal Fired Power Plant Units 3 & 4, Lampung |
2001 - 2005 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Coal Fired Steam Power Plant with capacity 2 x 100 MW |
26 |
Feasibility Study For Banjarmasin Steam Power Plant, South Sumatera |
2001 - 2003 |
PT Indonesia Power |
Feasibility Study For Steam Power Plant with capacity 2 x 100 MW |
27 |
Power Study and Maintenance Project for Maxus, Southeast Sumatera |
1998 - 2000 |
PT PLN (Persero) |
The study of the existing system and perform load flow, short circuit, protection study, updated the existing system for maintenance. |
28 |
Hydroelectric Power Plant and double circuit transmission line, Sipansihaporas, North Sumatera |
1997 - 2000 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Hydroelectric Power Plant with capacity 50 MW and 150 kV double circuit transmission line. |
29 |
Diesel Power Station V |
1997 - 1999 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Diesel Power Station V (D-V) extension of 11 Diesel Power Stations in Sumatera, Kalimantan, Sulawesi etc. with total installed capacity of 59,8 MW. |
30 |
Strengthening PLNs Environmental Management Capabilities |
1997 - 1998 |
PT PLN (Persero) |
Feasibility Study and development of environmental management in thermal power plant, geothermal power plant, hydroelectric power plant and transmission line in Jawa - Bali |
31 |
Mini Hydroelectric Power Plant, Ngoali, Maluku |
1997 - 1997 |
PT PLN (Persero) |
Study and design for mini hydroelectric power plant with capacity 0,95 MW |
32 |
North - West Sumatera Interconnector |
1997 - 1997 |
PT PLN (Persero) |
Feasibility study for secure the coverage of increasing electricity demand through a low cost interconnection of the existing 150 kV grids of North & West Sumatera |
33 |
Hydroelectric Power Plant, Poso-3, Central Sulawesi |
1996 - 1998 |
PT PLN (Persero) |
Feasibility Study for Hydroelectric Power Plant with capacity 1 x 324 MW |
34 |
Geothermal Power Plant, Gunung Salak 3, West Java |
1995 - 1997 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Geothermal Power Plant capacity 1 x 55 MW |
35 |
Mini Hydroelectric Power Plant, Amai, Irian Jaya and Ndugga, South East Nusa Tenggara |
1995 - 1996 |
PT PLN (Persero) |
Detail Design and Study of Mini Hydroelectic Power Plant Capacity Amai : 1 MW and capacity Ndungga : 1.4 MW |
36 |
Hydroelectric Power Plant & Associated Transmission Line 150 kV, 4 Circuits, Rajamandala, West Java |
1994 - 1996 |
PT PLN (Persero) |
Detail Design for Hydroelectric Power Plant capacity 51 MW and Transmission Line 150 kV, 4 Circuits from Kertasari to Cianjur (18 km) |
37 |
Combined Cycle Power Plant Block II, Tambak Lorok, Central Java |
1993 - 1997 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Combined Cycle Power Plant Capacity 1 x 500 MW |
38 |
Steam Power Plant, Ombilin West Sumatera |
1993 - 1997 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision Steam Power Plant Capacity 2 x 100 MW |
39 |
Hydroelectric Power Plant & Associated Transmission Line 150 kV Renun, North Sumatera |
1993 - 1996 |
PT PLN (Persero) |
Engineering Supervision and Construction Supervision for Hydroelectric Power Plant Capacity 2 x 41 MW and Transmission Line 150 kV from substation Brastagi to substation Silalahi (80 km) |
40 |
Geothermal Power Plant, Dieng, Central Java |
1993 - 1994 |
PT PLN (Persero) |
Study for prevention of poison gas of Geothermal Power Plant |
41 |
Steam Power Plant, Bukit Asam West Sumatera |
1992 - 1994 |
PT PLN (Persero) |
Detail Design Review and Drawing approval of Steam Power Plant Capacity 2 x 100 MW |
42 |
150 kV Transmission line, for Barito & Kuala Kapuas Central Kalimantan |
1992 - 1993 |
PT PLN (Persero) |
Soil Investigation for 150 KV Transmission Line |
43 |
Combined Cycle Power Plant, Gresik East Java |
1991 - 1993 |
PT PLN (Persero) |
Detail Design Review of Combined Cycle Power Plant 3 x 500 MW |
44 |
Diesel Power plant for Industrial Estate, Batam Island |
1990 - 1993 |
BPP. Batam |
Design & Supervision for Diesel Power Plant 4 x 7.5 MW |
45 |
Diesel Power plant for Nickel Industry, Pomala Southeast Sulawesi |
1989 – 199 |
PT Aneka Tambang |
Design for Diesel Power Plant Capacity 4 x 9.6 MW |
46 |
Peat Fired Steam Power Plant, Kalimantan |
1988 - 1989 |
PT Portry AE/PLN |
Feasibility Study for Peat Fired Steam Power Plant Capacity 50 MW |
47 |
Diesel Power plant for Army Weapon Industry, Bandung |
1985 - 1987 |
PT PINDAD (Persero) |
Review Design & Supervision for Power House and Diesel Power Plant |
48 |
Diesel Power plant for Navy and Commercial Ship Industry, Surabaya |
1984 - 1985 |
PT PAL (persero) |
Review Design & Supervision for Power House and Diesel Power Plant |
49 |
Diesel Power plant for Air Craft Industry, Bandung |
1983 - 1985 |
PT IPTN (Persero) |
Review Design & Supervision for Power House and Diesel Power Plant |
50 |
Steam Power Plant for Hydrocracking Refinery Dumai |
1980 - 1984 |
Pertamina |
Review Design & Supervision for Steam Power Plant 4 x 14 MW Hydrocracking Oil Refinery Plant |